Projects

Project Highlights

SELECTED CASE STUDIES

Project Portfolio

Alam Al Dabab Contracting

01

CASE STUDY · 01

Sudair Industrial CityPallet racking

Alam Al Dabab Contracting

Client: Alam Al Dabab Contracting

Manufacture, supply and installation of heavy-duty pallet racking across 10,000 m² for contracting materials and equipment.

Operational efficiency up 40%
Installed in 5 weeks
Zero failures after a year in service
View Project DetailsDuration: 5 weeks
مشروع تجهيز مستودع شركه تسلا الشرق

02

CASE STUDY · 02

الرياض تجهيز كامل

مشروع تجهيز مستودع شركه تسلا الشرق

Client: شركه تسلا الشرق

تجهيز احترافي

View Project DetailsDuration: 4 أسابيع
Tesla Gulf Trading Company

03

CASE STUDY · 03

Riyadh · Dammam · JeddahPallet, light-duty & mezzanine

Tesla Gulf Trading Company

Client: Tesla Gulf Trading Company

Manufacture, supply and installation of medium-duty racking across 4,800 m² for varied commercial goods.

Capacity for 850 commercial SKUs
Stocktake time down 35%
Installed in 4 weeks
View Project DetailsDuration: 4 weeks
Al Montaj Al Raqi Trading

04

CASE STUDY · 04

Riyadh — Al Dar Al BaidaLight-duty racking

Al Montaj Al Raqi Trading

Client: Al Montaj Al Raqi Trading

Manufacture, supply and installation of light-duty racking across 4,200 m² for commercial products.

1,200 adjustable shelf levels
Easy access to every SKU
Installed in 3 weeks
View Project DetailsDuration: 3 weeks
Injaz Al Salama Medical

05

CASE STUDY · 05

RiyadhPallet racking

Injaz Al Salama Medical

Client: Injaz Al Salama Medical

Manufacture, supply and installation of racking purpose-built for medical supplies, to health-authority standards.

Full compliance with health quality standards
2,400 medical SKUs organised
Installed in 4 weeks
View Project DetailsDuration: 4 weeks
Malaz Food Company Ltd

06

CASE STUDY · 06

RiyadhDrive-in & pallet racking

Malaz Food Company Ltd

Client: Malaz Food Company Ltd

Manufacture, supply and installation of specialised food-grade racking across 5,100 m² to HACCP standards.

Full HACCP compliance
Inventory turn improved 45%
Installed in 5 weeks
View Project DetailsDuration: 5 weeks
Ataa Al Waseel Trading

07

CASE STUDY · 07

Hotat Bani TamimMezzanine

Ataa Al Waseel Trading

Client: Ataa Al Waseel Trading

Manufacture, supply and installation of mezzanine racking across 3,000 m² to intensify storage capacity.

Storage capacity up 85%
Aisle space reduced 60%
Installed in 4 weeks
View Project DetailsDuration: 4 weeks
Fikrat Al Inara Trading

08

CASE STUDY · 08

RiyadhLight-duty racking

Fikrat Al Inara Trading

Client: Fikrat Al Inara Trading

Manufacture, supply and installation of multi-purpose racking across 5,800 m² for administrative supplies.

3,200 administrative SKUs organised
Search time down 70%
Installed in 5 weeks
View Project DetailsDuration: 5 weeks
Onwan Al Qahwa Trading Company

09

CASE STUDY · 09

Riyadh · Jeddah · Dammam and other citiesPallet racking

Onwan Al Qahwa Trading Company

Client: Onwan Al Qahwa Trading Company

Manufacture, supply and installation of specialised racking across 30,000 m² for coffee and beverage products.

Zero expiry incidents
FIFO compliance at 100%
Installed in 3 weeks
View Project DetailsDuration: 3 weeks
Al Riyadi Al Arabi Trading

10

CASE STUDY · 10

JeddahMezzanine

Al Riyadi Al Arabi Trading

Client: Al Riyadi Al Arabi Trading

Manufacture, supply and installation of two-tier mezzanine racking plus wide aisles across 7,200 m² for one of the largest commercial warehouses in the region.

Over 600 pallet positions
Height used up to 12 metres
Installed in 7 weeks
View Project DetailsDuration: 7 weeks
Al Saree Logistics Services

11

CASE STUDY · 11

RiyadhLogistics racking

Al Saree Logistics Services

Client: Al Saree Logistics Services

Manufacture, supply and installation of a complete logistics racking system across 8,400 m² to support distribution operations.

1,200 orders processed daily
Picking time down 50%
Installed in 8 weeks
View Project DetailsDuration: 8 weeks